Previous slide
Next slide
BRIDGE/SOUND WALL
MDOT - Flamingo Rd.
St. Clair, MI
2021
- Design and Installation of temporary bridge prior to demolition of old structure
- Removal of old bridge once new temporary 1-way structure was complete
- 7,000 SFT of galvanized PZC13 sheeting in four (4) permanent cofferdams
- 12hp74 piles x 115’ long installed in four (4) cofferdams
- Galvanized re-steel, substructure, and tremie concrete complete
- Set and install 3-span treated wooden bridge including deck, curb, and railing
- Excavation, backfill, channel excavation, rip rap, and HMA
- Utility and sewer work
Previous slide
Next slide
BRIDGE/SOUND WALL
MDOT - Flamingo Rd.
St. Clair, MI
2021
- Design and Installation of temporary bridge prior to demolition of old structure
- Removal of old bridge once new temporary 1-way structure was complete
- 7,000 SFT of galvanized PZC13 sheeting in four (4) permanent cofferdams
- 12hp74 piles x 115’ long installed in four (4) cofferdams
- Galvanized re-steel, substructure, and tremie concrete complete
- Set and install 3-span treated wooden bridge including deck, curb, and railing
- Excavation, backfill, channel excavation, rip rap, and HMA
- Utility and sewer work
PROJECTS
Goddard Rd. Over Sexton Kilfoil Drain: 2021
MDOT – Middlebelt Rd. Over Bell Creek: 2022
MDOT – Merriman Rd. Over Tarabusl Creek: 2022
East River Rd. Over North Hickory Canal: 2020
FCA Jeep Plant Sound Wall: 2019
River Rouge Oxbow Restoration Project – Phase III: 2018-2019
PROJECTS
Goddard Rd. Over Sexton Kilfoil Drain: 2021
MDOT – Middlebelt Rd. Over Bell Creek: 2022
MDOT – Merriman Rd. Over Tarabusl Creek: 2022
East River Rd. Over North Hickory Canal: 2020
FCA Jeep Plant Sound Wall: 2019
River Rouge Oxbow Restoration Project – Phase III: 2018-2019
Cherry Lawn Over I-96 Pedestrian Bridge: 2016
Oakland Avenue Over M-8 (3 bridge package): 2015