BRIDGE/SOUND WALL

MDOT - Merriman Rd. Over Tarabusi Creek
Livonia, MI

2022
  • Reconstruction of bridge under full closure
  • Demolition of cast in place 3-span structure
  • 12,500 SFT of steel sheet piling and 6,000 LF of 12hp53 h-piles
  • New abutments (500 CYD), 27” box beams, wingwalls, deck (205 CYD), railing, approach slabs
  • Excavation, backfill, utility location, and sewer work
  • 800 tons of rip rap