PILING/DRILLING
OVERVIEW
As a full-service piling contractor, E. C. Korneffel Co. (ECK) is equipped to handle all of your piling needs, including small- to large-sized projects and complex, fast track projects. ECK’s collection of crawler and telecrawler cranes up to 230 tons can drive full-length, one-piece piles up to 125’ without splicing. ECK owns more than twelve (12) fixed piling leads capable of driving one (1) piece piles in excess of 95’ full length. ECK’s fleet of Caterpillar excavators utilize sidegrip vibratory pile hammers that can install piling in low headroom conditions in as little as 20’.
ECK also owners multiple top drive hydraulic units set up in fixed piling leads than can drill Auger Cast Piles (ACIP) up to 36” in diameter.
We have recently updated our drilling fleet to include the following:
- Comacchio MC 22 HT tie-back & mini-pile machine
- ChemGrout double paddle mixers • TEI rock drill
- Oberman chemical/micro-fine cement pump
Our expanded drilling operations allow ECK to install soil nails and manchette tubes for ground improvement projects.
With this diverse range of equipment, ECK is uniquely positioned to complete projects that involve driving/drilling thousands of piles, tie-back installations, and ground improvement projects.
ECK typically drives or drills more than 10,000 foundation piles in one (1) calendar year.
PILING/DRILLING
As a full-service piling contractor, E. C. Korneffel Co. (ECK) is equipped to handle all of your piling needs, including small- to large-sized projects and complex, fast track projects.
SERVICES
ECK performs the following types of piling/drilling:
- H Piling up to 120’ full length
- Pipe Piles
- Concrete Piles
- Auger Cast Piles (ACIP) up to 36” in diameter
- Tie-backs (tendons or center bar)
- Soil nails
- Manchette tubes for chemical/cement grouting
- Shotcrete
- Helical Piers
- Timbers
PROJECTS
PROJECTS
BNA – Green/Beard/Waterman I-75 Project: 2022
Ford Motor Company – REV Project: 2022
BNA – Livernois/Springwell’s/Clark I-75 Project: 2020/2021
Henry Ford Parking Garage: 2021
Ford Motor Company – BEV F150 Plant: 2020
MDOT 2nd Avenue Over I-94: 2020
PAST PROJECTS
Henry Ford Health System: 2018
Ford Wind Tunnel/Battery/ Lab: 2018