EARTH RETENTION
PLTCM Project
Dearborn, MI
2008
- Furnishing and installation of 100′ long King Piles interlocking with 70′ steel sheeting piling
- Continuous double 14hp117 walers with 30″ to 36″ pipe struts spanning 85′ across the pit
- Raker bracing cast into the 4′ thick concrete mat
- System was designed to support an excavation depth to 34′ in soil conditions with unconfined compressive strengths of less than 500 psf
- Rail car delivery unloading, handling, and transportation from ECK’s Trenton, MI rail facility
Previous slide
Next slide
EARTH RETENTION
PLTCM Project
Dearborn, MI
2008
- Furnishing and installation of 100′ long King Piles interlocking with 70′ steel sheeting piling
- Continuous double 14hp117 walers with 30″ to 36″ pipe struts spanning 85′ across the pit
- Raker bracing cast into the 4′ thick concrete mat
- System was designed to support an excavation depth to 34′ in soil conditions with unconfined compressive strengths of less than 500 psf
- Rail car delivery unloading, handling, and transportation from ECK’s Trenton, MI rail facility