EARTH RETENTION

Ford Pond & Pump House
Dearborn, MI

2019/2020
  • Furnish/Install a 66′ diameter circular King Pile earth retention system (ERS) to support a 39’ excavation
  • Alternating W18 x 130 steel king piles interlocking with PZ 27 x 55′ long
  • Four (4) levels of internal concrete ring bracing
  • Furnish and install two (2) each three sided sheet pile cofferdams internally braced
  • Furnished 100 lft of cantilevered steel sheet piling
  • 34 each 12hp53 piles x 72.5′ long h-piles driven in a 39′ excavation
  • Form/pour 4′ thick tremie mat in the bottom of the circular cell
Previous slide
Next slide

EARTH RETENTION

Ford Pond & Pump House
Dearborn, MI

2019/2020
  • Furnish/Install a 66′ diameter circular King Pile earth retention system (ERS) to support a 39’ excavation
  • Alternating W18 x 130 steel king piles interlocking with PZ 27 x 55′ long
  • Four (4) levels of internal concrete ring bracing
  • Furnish and install two (2) each three sided sheet pile cofferdams internally braced
  • Furnished 100 lft of cantilevered steel sheet piling
  • 34 each 12hp53 piles x 72.5′ long h-piles driven in a 39′ excavation
  • Form/pour 4′ thick tremie mat in the bottom of the circular cell