PILING/DRILLING
Ford Wind Tunnel/Battery Lab
Allen Park, MI
2018
WIND TUNNEL
- Furnish and installation of 21 each 14hp73 x 95′ driven to 125 tons
- Furnish and installation of 63 each 16hp88 x 95′ driven to 165 tons
- ASTM D1143 Static Load Test for 14hp43 & 16hp88
- 28 each 24″ ACIP piles x 85′ (103 tons)
- ASTM D1143 Static Load test for a 24″ ACIP
BATTERY LAB
- 33 each 18″ ACIP x 85′ (95 tons)
- 191 each 24″ ACIP x 85′ (140.5 tons
- ASTM D1143 Static Load test for a 18″ ACIP
Previous slide
Next slide
PILING/DRILLING
Ford Wind Tunnel/Battery Lab
Allen Park, MI
2018
WIND TUNNEL
- Furnish and installation of 21 each 14hp73 x 95′ driven to 125 tons
- Furnish and installation of 63 each 16hp88 x 95′ driven to 165 tons
- ASTM D1143 Static Load Test for 14hp43 & 16hp88
- 28 each 24″ ACIP piles x 85′ (103 tons)
- ASTM D1143 Static Load test for a 24″ ACIP
BATTERY LAB
- 33 each 18″ ACIP x 85′ (95 tons)
- 191 each 24″ ACIP x 85′ (140.5 tons
- ASTM D1143 Static Load test for a 18″ ACIP
PROJECTS
PROJECTS
BNA – Green/Beard/Waterman I-75 Project: 2022
Ford Motor Company – REV Project: 2022
BNA – Livernois/Springwell’s/Clark I-75 Project: 2020/2021
Henry Ford Parking Garage: 2021
Ford Motor Company – BEV F150 Plant: 2020
MDOT 2nd Avenue Over I-94: 2020
PAST PROJECTS
Henry Ford Health System: 2018
Ford Wind Tunnel/Battery/ Lab: 2018