Previous slide
Next slide
PILING/DRILLING
Botsford Hospital
Farmington Hills, MI
2016
- Drilling 96 each 18” dia x 60’ long Auger Cast piles (ACIP)
- Drilling 113 each 24” dia x 60’ long Auger Cast piles (ACIP)
- 2 each Axial Compressive static Load Test – ASTM D1143
- 2 each Axial Tension Load Test – ASTM D3689
- 2 each Lateral Load Test – ASTM D3966
Previous slide
Next slide
PILING/DRILLING
Botsford Hospital
Farmington Hills, MI
2016
- Drilling 96 each 18” dia x 60’ long Auger Cast piles (ACIP)
- Drilling 113 each 24” dia x 60’ long Auger Cast piles (ACIP)
- 2 each Axial Compressive static Load Test – ASTM D1143
- 2 each Axial Tension Load Test – ASTM D3689
- 2 each Lateral Load Test – ASTM D3966
PROJECTS
PROJECTS
BNA – Green/Beard/Waterman I-75 Project: 2022
Ford Motor Company – REV Project: 2022
BNA – Livernois/Springwell’s/Clark I-75 Project: 2020/2021
Henry Ford Parking Garage: 2021
Ford Motor Company – BEV F150 Plant: 2020
MDOT 2nd Avenue Over I-94: 2020
PAST PROJECTS
Henry Ford Health System: 2018
Ford Wind Tunnel/Battery/ Lab: 2018