Previous slide
Next slide

PILING/DRILLING

BNA - Green/Beard/Waterman I-75 Project
Detroit, MI

2022
  • Furnish and install 132 ea. 14hp102 in varying lengths from 90’ to 100’ long to 300-ton capacity
  • Perform 12 ea. PDA Test piles
  • Vertical and Batter piles with a 2.5 to 1 batter
Previous slide
Next slide

PILING/DRILLING

BNA - Green/Beard/Waterman I-75 Project
Detroit, MI

2022
  • Furnish and install 132 ea. 14hp102 in varying lengths from 90’ to 100’ long to 300-ton capacity
  • Perform 12 ea. PDA Test piles
  • Vertical and Batter piles with a 2.5 to 1 batter