PILING/DRILLING
Marathon
Detroit, MI
2008-2010
- Furnishing and installation of 7,700 full length 95′ h-piles
- Furnishing and installation of multiple steel sheet piling pits with interior sheeting walls and two (2) levels of bracing.
- System is designed to support an excavation depth in excess of 20′ in soil conditions with unconfined compressive strengths of less than 500 psf.
- Furnishing and installation of in excess of 500 piles in low headroom and restricted access areas.
PILING/DRILLING
Marathon
Detroit, MI
2008-2010
- Furnishing and installation of 7,700 full length 95′ h-piles
- Furnishing and installation of multiple steel sheet piling pits with interior sheeting walls and two (2) levels of bracing.
- System is designed to support an excavation depth in excess of 20′ in soil conditions with unconfined compressive strengths of less than 500 psf.
- Furnishing and installation of in excess of 500 piles in low headroom and restricted access areas.
PROJECTS
PROJECTS
BNA – Green/Beard/Waterman I-75 Project: 2022
Ford Motor Company – REV Project: 2022
BNA – Livernois/Springwell’s/Clark I-75 Project: 2020/2021
Henry Ford Parking Garage: 2021
Ford Motor Company – BEV F150 Plant: 2020
MDOT 2nd Avenue Over I-94: 2020
PAST PROJECTS
Henry Ford Health System: 2018
Ford Wind Tunnel/Battery/ Lab: 2018