EARTH RETENTION
Easterly Water Treatment Plant
Cleveland, OH
2014
- Furnishing and installation of 3,000 LFT of temporary and permanent steel sheet piling
- Supporting excavation depth varying from 14’ to 17’
- Wall is supported by a combination of internal bracing (wale and pipe struts) and cantilevered sheet piling
Previous slide
Next slide
EARTH RETENTION
Easterly Water Treatment Plant
Cleveland, OH
2014
- Furnishing and installation of 3,000 LFT of temporary and permanent steel sheet piling
- Supporting excavation depth varying from 14’ to 17’
- Wall is supported by a combination of internal bracing (wale and pipe struts) and cantilevered sheet piling