Severstal NA New Cold Mill, Hot Mill, and B Blast Furnace
Dearborn, MI
2008
- Furnishing and installation of 100' long King Piles interlocking with 70' steel sheeting piling
- Continuous double 14hp117 walers with 30" to 36" pipe struts spanning 85' across the pit
- Raker bracing cast into the 4' thick concrete mat
- System was designed to support an excavation depth to 34' in soil conditions with unconfined compressive strengths of less than 500 psf
- Furnishing and installation of 3,500 each full length 110' h-piles
- Rail car delivery unloading, handling, and transportation from ECK’s Trenton, MI rail facility