EARTH RETENTION

PLTCM Project
Dearborn, MI

2008
  • Furnishing and installation of 100′ long King Piles interlocking with 70′ steel sheeting piling
  • Continuous double 14hp117 walers with 30″ to 36″ pipe struts spanning 85′ across the pit
  • Raker bracing cast into the 4′ thick concrete mat
  • System was designed to support an excavation depth to 34′ in soil conditions with unconfined compressive strengths of less than 500 psf
  • Rail car delivery unloading, handling, and transportation from ECK’s Trenton, MI rail facility
Previous
Next

EARTH RETENTION

PLTCM Project
Dearborn, MI

2008
  • Furnishing and installation of 100′ long King Piles interlocking with 70′ steel sheeting piling
  • Continuous double 14hp117 walers with 30″ to 36″ pipe struts spanning 85′ across the pit
  • Raker bracing cast into the 4′ thick concrete mat
  • System was designed to support an excavation depth to 34′ in soil conditions with unconfined compressive strengths of less than 500 psf
  • Rail car delivery unloading, handling, and transportation from ECK’s Trenton, MI rail facility