ECKorneffelLogo
Previous
Next

BRIDGE/SOUND WALL

Link Detroit
(4 Bridge Package)
Detroit, MI

2014
  • Demolition and reconstruction of four (4) bridges in Eastern Market, downtown Detroit
  • 25,000 LFT of h-piling installed
  • Substructure concrete and three (3) sided culverts replaced old bridges
  • Over 1,000 LFT of decorative parapet railing installed
  • Surface coating of all structures
Previous
Next

BRIDGE/SOUND WALL

Link Detroit
(4 Bridge Package)
Detroit, MI

2014
  • Demolition and reconstruction of four (4) bridges in Eastern Market, downtown Detroit
  • 25,000 LFT of h-piling installed
  • Substructure concrete and three (3) sided culverts replaced old bridges
  • Over 1,000 LFT of decorative parapet railing installed
  • Surface coating of all structures