ECKorneffelLogo
Previous
Next

MARINE

DTE Station A Remediation
Detroit, MI

2018
  • 500′ of NZ26 x 50′ steel sheet piling for deadman wall with W21 x 101 waler installed on existing PZ 35 sheet piling supporting 30′ excavation against Detroit River 
  • W24 x 76 King Piles @ 24′ O.C. interlocking with NZ26 and intermediate internal NZ19 sheet piling walls • Interlock sealant applied to sheet piling locks 
  • 8″ HSS diagonal tube bracing at 24′ O.C. cast in Tremie concrete 
  • 5,400 yards of Tremie poured in six (6) pours to encase the diagonal brace 30′ below existing grade