PILING/DRILLING

BNA - Livernois/Springwell's/Clark
I-75 Project
Detroit, MI

2020/2021
  • Furnish and install 37,275 sft. of steel sheet piling for five (5) each earth retention systems
  • Multiple lines of internal bracing, Deadman with tie-rods, and steel rakers
  • Furnish and install 437 ea. 14hp102 ranging from 90′ long to 110′ driven to 300-ton capacity
  • Vertical and batter piles with a 2.5 to 1 batter
  • Perform 18 each PDA pile tests
Livernois
Springwells
Clark
Previous
Next

PILING/DRILLING

BNA - Livernois/Springwell's/Clark
I-75 Project
Detroit, MI

2020/2021
  • Furnish and install 37,275 sft. of steel sheet piling for five (5) each earth retention systems
  • Multiple lines of internal bracing, Deadman with tie-rods, and steel rakers
  • Furnish and install 437 ea. 14hp102 ranging from 90′ long to 110′ driven to 300-ton capacity
  • Vertical and batter piles with a 2.5 to 1 batter
  • Perform 18 each PDA pile tests