Grosse Pointe Yacht Club (GPYC) – Phase 1A/1B, Sail Center - 2016-2017
Grosse Pointe Shores, MI 

  • Installation of 1,500’ of 30’ long galvanized sheet piling tied together with double channel walers and 7,000 tons of stone. 
  • New pile supported galvanized electronically operated swing bridge on 16” pipe piles.
  • 28 new pipe pile supported galvanized docks for 56 new slips with 40’ long Class A/B piles.
  • 1,500’ of new concrete walkway extending into Lake St. Clair.
  • 2,600 yards of dredging.
  • Site work, electrical, plumbing, pumpout, and paving complete.