Lafarge
Toledo, OH
2019
- 500' of NZ26 x 55' long NZ 26 steel sheet piling from a barge
- Install twenty one (21) grouted tie-back anchors 8" x 75' long to a capacity of 180 kips
- Timber dolphin pile cluster and 20' long laminated fenders installed on site
- Place over 1,000 yards of concrete annulus fill • Sitework and concrete flatwork complete