PILING/DRILLING
Henry Ford Health System
Detroit Pistons Parking Garage
Detroit, MI
2018
- 226 each 24″ ACIP x 70′ long for the CEP (125 tons static)
- Furnish/set 226 each 8 #7 bar cages w/#4 ties x 40′ long
- Two (2) each ASTM D1143 Static Load Test for 24″ ACIP
PILING/DRILLING
Henry Ford Health System
Detroit Pistons Parking Garage
Detroit, MI
2018
- 226 each 24″ ACIP x 70′ long for the CEP (125 tons static)
- Furnish/set 226 each 8 #7 bar cages w/#4 ties x 40′ long
- Two (2) each ASTM D1143 Static Load Test for 24″ ACIP