  • Installation of 1,500’ of 30’ long galvanized sheet piling tied together with double channel walers and 7,000 tons of stone. 
  • New pile supported galvanized electronically operated swing bridge on 16” pipe piles. 
  • 28 new pipe pile supported galvanized docks for 56 new slips with 40’ long Class A/B piles. 
  • 1,500’ of new concrete walkway extending into Lake St. Clair. 
  • 2,600 yards of dredging. 
  • Site work, electrical, plumbing, pump out, and paving complete.
Previous
Next

MARINE

Grosse Pointe Yacht Club
Grosse Pointe Shores, MI

2016-2017
  • Installation of 1,500’ of 30’ long galvanized sheet piling tied together with double channel walers and 7,000 tons of stone. 
  • New pile supported galvanized electronically operated swing bridge on 16” pipe piles. 
  • 28 new pipe pile supported galvanized docks for 56 new slips with 40’ long Class A/B piles. 
  • 1,500’ of new concrete walkway extending into Lake St. Clair. 
  • 2,600 yards of dredging. 
  • Site work, electrical, plumbing, pump out, and paving complete.