Grosse Pointe Yacht Club (GPYC) 
Phase 1A/1B, Sail Center 
Grosse Pointe Shores, MI
2016-201
  • Installation of 1,500 of 30 long galvanized sheet piling tied together with double channel walers and 7,000 tons of stone. 
  • New pile supported galvanized electronically operated swing bridge on 16 pipe piles. 
  • 28 new pipe pile supported galvanized docks for 56 new slips with 40 long Class A/B piles. 
  • 1,500 of new concrete walkway extending into Lake St. Clair. 
  • 2,600 yards of dredging. 
  • Site work, electrical, plumbing, pumpout, and paving complete.