Detroit Riverfront Dock and Fishing Pier
Trenton, MI
2015 - 2106
- Installation of nineteen (19) braced cofferdams consisting of 14’ x 17’ PZ 27 cofferdams with one (1) level of bracing.
- Installation of a 200’ x 20’ stone filled pier 800’ offshore consisting of PZ 27 sheeting piling with cast steel tips driven into rock including one (1) level of internal bracing and concrete surface.
- 19 each intermediate PZ 27 sheet pile cofferdams with rock tips, stone fill and concrete surface to support 750’ of steel walkways, railings, boardwalks, electrical, and floating dock.