PILING/DRILLING

Cleveland Cliffs
Toledo, OH

2018
  • Furnish and installation of 159 each 36″ x .52″ x 93′ driven to 300 tons 
  • 36″ A252 Grade 3 pipe piles spliced together in the field from 80′ & 13′ stock 
  • PDA testing of sixteen (16) piles