  • Furnish and place 45,000 tons of 8″–16″ and 28″–36″ rip rap in the construction seven (7) each stone shoals
  • Dredging of 12,000 cyds of in situ sand and construction of a habit shoal to include plantings, seeding, 
    and live stakes
  • Furnishing and placing various habitat stone and log structures in the exiting inner bay area