• Text Hover
Celeron Island Restoration
Gibraltar, MI
2018 - 2019

  • Furnish and place 45,000 tons of 8"–16" and 28"–36" rip rap in the construction seven (7) each stone shoals
  • Dredging of 12,000 cyds of in situ sand and construction of a habit shoal to include plantings, seeding, 
    and live stakes
  • Furnishing and placing various habitat stone and log structures in the exiting inner bay area
  • Text Hover
  • Text Hover